Tianjin Timeast Offshore Engineering Co., Ltd.
|
Place of Origin: | Tianjin, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
Huludao Island & Juehuadao Island Water Supply Pipeline Project (Year 2017.10)
offshore pipeline installation for Tanzania
submarine pipe installation
Project Introduction: This project is water supplying from land to offshore island. Pipeline total length: 7km, diameter: DN200mm, material: HDPE, the subsea pipeline laying method is float-pulling due to the shallow water condition.